"Enaerios“ Cable System (Naxos, Greece)

The site comprises 72 pillars ranging from 5 to 43 meters in height, 19 km double cable lines, 6 loading stations, 220 suspended ore-transport buckets, 2 engine rooms, supporting buildings, material warehouses, and loading and weighing facilities both at the stations and at the port of Moutsouna.

APPROACH

  • Inspect cable wear and detect fraying or corrosion
  • Assess structural health of infrastructure
  • Visualize and simulate the operational workflow

SENSORS AND TECHNIQUES

  • UAV monitoring
  • 3D photogrammetric modelling
  • DT + AR goggles for visualization